Estimate how many bags of concrete mix you need for footings, slabs, and small pours.
For estimation purposes only. Terms of Use
A 3m × 1.2m slab at 100mm thick with 5% waste using 40 kg bags:
Use this for small pours where ready-mix trucks don't make sense — footings, pads, walkways, and repairs — or when ordering bagged mix from a supplier.
For slabs or footings over roughly 1 m³, ready-mix concrete is usually cheaper and more consistent than bags. Always confirm bag yields with the mix manufacturer's label.
About 53 bags — a 40 kg bag yields roughly 0.019 m³ of mixed concrete. Confirm with your specific mix, since yields vary.
For very small quantities, yes. Above about 1 m³, ready-mix is usually cheaper per cubic metre and gives more consistent results.